Tendarix.ca
BUSINESS NEWS
Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowOpinion: Mark Carney’s climate ambitions still threaten Canada’s economy· Financial PostQ3-26 Canadian Business Outlook Survey: More firms plan cost pass-through· RBCA new chapter in Canada-India economic relations· Business Council of CanadaStaying in Canada is a 'huge relief' for Alberta business leaders· CBCWhat Canadian Businesses Must Embrace to Compete in a Volatile Global Economy· Open CanadaCarney, Erdogan launch ‘strong and resilient’ Canada-Turkiye partnership· Al JazeeraTrump administration cancels some Canada tariffs amid close midterm races· NBC NewsJapan-Canada Chambers Council Joint Statement· Canadian Chamber of CommerceGlobal trade is changing how the Canadian economy works· Bank of CanadaCanada’s services PMI shows sector shrinking for fourth straight month in September· The Globe and MailSoft economy should limit Bank of Canada's rate hikes: Capital Economics· BNN BloombergEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global NewsCanada’s inflation data, business survey on tap ahead of BoC decision· RBCPosthaste: U.S. businesses feel fresh pain from trade war with Canada, says this hot take on the economy· Financial Post
← All tenders
Fisheries and Oceans Canada

Réparations du quai, La Scie, T.-N.

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
July 27, 2020
Published
July 10, 2020
Type
Construction
Explore similarBuilding and Facility Construction and Maintenance ServicesOntario

Full description

The scope of work for this project consists of the furnishing of all plant, labour, equipment and material for the repairs to the existing wharves located at La Scie, NL, in strict accordance with the specifications and accompanying drawings and subject to all terms and conditions of the Contract.
In general, the work under this contract consists of, but will not necessarily be limited to, the following:
.1 Work Area #1 (as defined on the drawings):
.1 Complete removal and replacement of the existing wheelguard and wheelguard blocking with new, as indicated on the drawings within in each Section identified.
.2 Complete removal and replacement of the existing horizontal and vertical fenders with new, as indicated on the drawings within in each Section identified.
.3 Complete removal and replacement of the existing ladders with new, as indicated on the drawings within in each Section identified. In addition to the existing ladder replacement, new ladder locations are also added, as indicated on the drawings.
.4 An allowance has been made to replace existing deteriorated coping with new, within the Sections identified. Complete removal of existing coping pieces and installation of new coping, as detailed on the drawings, within areas approved by the Departmental Representative.
.5 Temporarily remove/relocate the existing waterline and electrical teck cable, as required, and reinstall in new work, as noted on the drawings. If either of the electrical or waterline(s) have to be disconnected during construction activities, contractor will be required to provide and maintain temporary electrical power and water to the affected areas.
.6 Temporarily remove/relocate existing miscellaneous items, as required, and reinstall in new work, as noted on the drawings. Items include, but not necessarily limited to, sign and posts, life ring frame, and tire bumpers.
.2 Work Area #2 (as defined on the drawings):
.1 Complete removal and replacement of the existing top horizontal fenders with new, as indicated on the drawings within in each Section identified. Bottom horizontal fender to remain.
.2 Install new vertical fenders where existing are missing and/or significantly split, as indicated on the drawings, within in each Section identified. Complete removal of the existing split timbers will be required.
.3 Complete removal and replacement of the existing ladders with new, as indicated on the drawings within in each Section identified.
.4 Completed removal and replacement of the existing plywood electrical chase with new, as indicated on the drawings, within the Section identified.
.5 Temporarily remove/relocate the existing waterline and electrical conduits, as required, and reinstall in new work, as noted on the drawings. If either of the electrical or waterline(s) have to be disconnected during construction activities, contractor will be required to provide and maintain temporary electrical power and water to the affected areas.
.6 Temporarily remove/relocate existing miscellaneous items, as required, and reinstall in new work, as noted on the drawings.
.3 It is a requirement of this project that the contractor must finish each Section identified, within each Work Area, prior to proceeding with work on the next Section. Upon completion of each section, obtain Departmental Representative’s approval, prior to proceeding.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 28 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
PW-20-00920067
Solicitation no.
F5211-200176
Buyer
Fisheries and Oceans Canada
Notice type
Request for Proposal
Method
Competitive - Open bidding
Procurement category
*CNST
Trade agreements
*Canadian Free Trade Agreement (CFTA)
Estimated value
Not disclosed
Source
canadabuys

Classification & terms

GSIN
*5139D — *General Marine Construction Work
UNSPSC
UNSPSC 72000000 — Building and Facility Construction and Maintenance Services

Delivery & regions

Province
Ontario
Regions of delivery
*Newfoundland and Labrador

Key dates

Published
July 10, 2020
Closes
July 27, 2020
Amendment no.
001

Contact

End-user
Fisheries and Oceans Canada
Sign up free to see the contact details

Award history

10 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.

Upgrade to Pro

Live tenders

City of Toronto1 day left

The City of Toronto’s Engineering & Construction Services division is bringing forward a Request for Tenders for Rehabilitation of Bridge ID147 Don Mills Road over Metrolinx and Bridge ID801 Tara Avenue over Metrolinx and TTC Busway as furt…

Construction
76 MATCHView →
City of Toronto1 day left

Request for Tenders (RFT) for Watermain Replacement and TTC Track Replacement on King Street West between Portland Street and Spadina Avenue. Please review all documentation pertaining to the tender in the SAP Ariba publication or register…

Construction
79 MATCHView →
Islands Trust (Islands Trust)2 days left

Islands Trust Accessibility Plan Development

Construction
81 MATCHView →