Two of its member municipalities are connected to the Regional System via another member municipality. The Summer of Village of Norglenwold and Summer Village of Jarvis Bay deliver wastewater through separate lines connected to the Town of Sylvan Lake’s wastewater collection system. At the point of connection is a meter chamber and flow meter. The project will look to replace or rehabilitate these meter locations.
The project is composed of two parts. The first part is to rehabilitate the concrete meter chamber and electrical and replace the meter at the Summer Village of Norglenwold LPS Metering Chamber (Part 1). The second part is to demolish the existing and to construct a new metering chamber and connection along with the installation of new power and electrical and meter at the Summer Village of Jarvis Bay LPS Metering Chamber (Part 2). Part 2 is being list as provisional and is conditional on pricing and scheduling received in this request for proposal. Part 2 may be deleted from at time of award.